Skip to main content

Plan one day without grid power

What size power station does your outage plan require?

List the loads that matter, set realistic hours and duty cycles, then keep capacity, running output, and startup demand as separate decisions.

Build the load

Critical appliances

Current 1kWh records

Capacity and output are separate gates

This planner estimates electrical demand. It does not replace manufacturer instructions, electrical code, transfer equipment requirements, or professional advice for hardwired loads. Save and copy features stay on your device.